East side entrance to the main bunker. It has been allowed to become flooded. All lower levels of the bunker are flooded as well. Sadly, the competent French authorities have no intention to pump out the water, so an important part of the complex is inaccessible.
This entrance runs to the servicing hall and goes straight through the bunker. A train track went through it (no longer visible). The tunnel was intended for the unloading of V2 rockets, after inspection at the reception station which is at the northern section of the site. Leica R8 with Vario-Elmarit-R 35-70/2.8 ASPH, Fujichrome Provia 100 F
Scanned with Nikon Super-Coolscan LS-2000.